ST 1 A NB over OTHER RELIEF

1.4 KM NE OF CALLAHAN · County 025, Massachusetts · Built 1951 · 2 Lanes · 29,117 vehicles/day

Overall
Fair
Deck
7
Good
Superstructure
7
Good
Substructure
5
Fair

Bridge Details

Structure #
B1623539XDOTNBI
Year Built
1951
Reconstructed
2005
Length
80.5 m (264.1 ft)
Max Span
23.5 m
Width
17 m (55.8 ft)
Lanes
2
Daily Traffic
29,117
Material
Steel
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$8,940,000
Total Project Cost
$13,411,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.