HWY PORTER ST over OTHER PEDESTRIAN WLKWY

15.2 M S OF SR 1A · County 025, Massachusetts · Built 1907 · 2 Lanes · 4,300 vehicles/day

Overall
Fair
Deck
5
Fair
Superstructure
5
Fair
Substructure
5
Fair

Bridge Details

Structure #
B160733HTDOT634
Year Built
1907
Reconstructed
1979
Length
12.2 m (40 ft)
Max Span
11.6 m
Width
14.8 m (48.6 ft)
Lanes
2
Daily Traffic
4,300
Material
Prestressed Concrete
Design
Slab
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$1,250,000
Total Project Cost
$1,876,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.