HWY MERIDIAN ST over ST 1 A/NB

AT EAST END OF CAL TNL · County 025, Massachusetts · Built 1961 · 2 Lanes · 20,689 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
5
Fair
Substructure
6
Satisfactory

Bridge Details

Structure #
B16234BKUDOTNBI
Year Built
1961
Length
14.3 m (46.9 ft)
Max Span
12.1 m
Width
18.9 m (62 ft)
Lanes
2
Daily Traffic
20,689
Material
Steel
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$1,841,000
Total Project Cost
$2,762,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.