ST225 BEDFORD RD over WATER CONCORD RIVER

AT TWNLN BEDFORD-CARLISLE · County 017, Massachusetts · Built 1955 · 2 Lanes · 9,750 vehicles/day

Structurally Deficient — One or more key components rated 4 (Poor) or below
Overall
Poor
Deck
5
Fair
Superstructure
5
Fair
Substructure
4
Poor

Bridge Details

Structure #
B040022K4DOTNBI
Year Built
1955
Length
57.9 m (190 ft)
Max Span
6.1 m
Width
11.8 m (38.7 ft)
Lanes
2
Daily Traffic
9,750
Material
Concrete Continuous
Design
Slab
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$9,616,000
Total Project Cost
$14,425,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.