ST225 BEDFORD RD over WATER CONCORD RIVER
AT TWNLN BEDFORD-CARLISLE · County 017, Massachusetts · Built 1955 · 2 Lanes · 9,750 vehicles/day
Structurally Deficient
— One or more key components rated 4 (Poor) or below
Overall
Deck
5
Fair
Superstructure
5
Fair
Substructure
4
Poor
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 5 | Fair |
| Superstructure | 5 | Fair |
| Substructure | 4 | Poor |
Location
42.509078, -71.314069
This bridge is in worse condition than 89.4% of bridges in County 017. The average bridge in Massachusetts is 0 years old; this one is 71 years old.
Nearby Bridges
ST 4 NASHUA RD over WATER CONCORD RIVER
Built 2008
HWY ORCHARD RD over US 3
Built 2004
HWY SOUTH RD over WATER ELM BROOK
Built 1970
HWY CONCORD RD over US 3
Built 2004
HWY OLD BILLERIC over US 3
Built 2004
US 3 SB over WATER CONCORD RIVER
Built 2004
US 3 NB over WATER CONCORD RIVER
Built 2004
ST 62 BURLINGTN RD over WATER SHAWSHEEN RIVER
Built 1962
ST 4 GREAT RD over WATER SHAWSHEEN RIVER
Built 1903
HWY PAGE RD over WATER SHAWSHEEN RIVER
Built 2009
Bridge Details
- Structure #
- B040022K4DOTNBI
- Year Built
- 1955
- Length
- 57.9 m (190 ft)
- Max Span
- 6.1 m
- Width
- 11.8 m (38.7 ft)
- Lanes
- 2
- Daily Traffic
- 9,750
- Material
- Concrete Continuous
- Design
- Slab
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $9,616,000
- Total Project Cost
- $14,425,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.