HWY SOUTH RD over WATER ELM BROOK

.6 MI S OF RT 4 & 225 · County 017, Massachusetts · Built 1970 · 2 Lanes · 3,750 vehicles/day

Structurally Deficient — One or more key components rated 4 (Poor) or below
Overall
Poor
Culvert
4
Poor

Bridge Details

Structure #
B040102B7MUNNBI
Year Built
1970
Length
6.7 m (22 ft)
Max Span
3 m
Width
15.7 m (51.5 ft)
Lanes
2
Daily Traffic
3,750
Material
Concrete
Design
Culvert
Owner
Town or Township Highway Agency
Last Inspected
N/A
Est. Improvement
$1,184,000
Total Project Cost
$1,777,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.