HWY SUMMER ST over WATER SHAWSHEEN RIVER

2.5 MI E OF SOUTH RD · County 017, Massachusetts · Built 1959 · 2 Lanes · 5,820 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
6
Satisfactory
Substructure
5
Fair

Bridge Details

Structure #
B040172B8MUNNBI
Year Built
1959
Length
8.5 m (27.9 ft)
Max Span
8.2 m
Width
13.4 m (44 ft)
Lanes
2
Daily Traffic
5,820
Material
Prestressed Concrete
Design
Box Beam or Girders - Multiple
Owner
Town or Township Highway Agency
Last Inspected
N/A
Est. Improvement
$783,000
Total Project Cost
$1,175,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.