US 3 SB over ST 62 BURLINGTON RD

RT 3 AT RT 62 · County 017, Massachusetts · Built 2004 · 4 Lanes · 38,322 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
B04011AY9DOTNBI
Year Built
2004
Length
40.3 m (132.2 ft)
Max Span
38.2 m
Width
24.5 m (80.4 ft)
Lanes
4
Daily Traffic
38,322
Material
Steel
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$653,000
Total Project Cost
$980,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.