HWY OLD BILLERIC over US 3

1.0 MI NORTH OF ROUTE 62 · County 017, Massachusetts · Built 2004 · 2 Lanes · 3,900 vehicles/day

Overall
Fair
Deck
7
Good
Superstructure
6
Satisfactory
Substructure
7
Good

Bridge Details

Structure #
B04013761DOTNBI
Year Built
2004
Length
95.6 m (313.6 ft)
Max Span
48.3 m
Width
12.8 m (42 ft)
Lanes
2
Daily Traffic
3,900
Material
Steel Continuous
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$4,488,000
Total Project Cost
$6,733,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.