HWY ORCHARD RD over US 3
1.5 MI SE CONCORD RIVER · County 017, Massachusetts · Built 2004 · 2 Lanes · 1,800 vehicles/day
Overall
Deck
7
Good
Superstructure
6
Satisfactory
Substructure
7
Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 7 | Good |
| Superstructure | 6 | Satisfactory |
| Substructure | 7 | Good |
Location
42.529322, -71.273469
This bridge is in worse condition than 25.6% of bridges in County 017. The average bridge in Massachusetts is 0 years old; this one is 22 years old.
Nearby Bridges
HWY CONCORD RD over US 3
Built 2004
HWY OLD BILLERIC over US 3
Built 2004
ST 4 NASHUA RD over WATER CONCORD RIVER
Built 2008
US 3 SB over WATER CONCORD RIVER
Built 2004
US 3 NB over WATER CONCORD RIVER
Built 2004
HWY MDDLSEX TPK over WATER SHAWSHEEN RIVER
Built 2023
US 3 NB over WATER SHAWSHEEN RIVER
Built 2004
US 3 SB over WATER SHAWSHEEN RIVER
Built 2004
HWY RIVER ST over WATER CONCORD RIVER
Built 2003
US 3 NB over HWY FARM RD
Built 2004
Bridge Details
- Structure #
- B120268FRDOTNBI
- Year Built
- 2004
- Length
- 65.9 m (216.2 ft)
- Max Span
- 32.3 m
- Width
- 15.2 m (49.9 ft)
- Lanes
- 2
- Daily Traffic
- 1,800
- Material
- Steel Continuous
- Design
- Stringer/Multi-beam or Girder
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $597,000
- Total Project Cost
- $896,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.