US 3 NB over HWY FARM RD

0.25 MI S TREBLECOVE RD · County 017, Massachusetts · Built 2004 · 3 Lanes · 53,663 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
B120238YNDOTNBI
Year Built
2004
Length
14 m (45.9 ft)
Max Span
12.1 m
Width
23.5 m (77.1 ft)
Lanes
3
Daily Traffic
53,663
Material
Steel
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$230,000
Total Project Cost
$346,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.