US 3 NB over WATER CONCORD RIVER

0.5 MI NW RT3 & CNCRD RD · County 017, Massachusetts · Built 2004 · 3 Lanes · 81,500 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
B120228G2DOTNBI
Year Built
2004
Length
62.2 m (204.1 ft)
Max Span
60 m
Width
23.9 m (78.4 ft)
Lanes
3
Daily Traffic
81,500
Material
Steel
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
$0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.