HWY TREBLE COVE over US 3

1.2 MI. N. OF CONCORD RD. · County 017, Massachusetts · Built 2004 · 4 Lanes · 12,400 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
6
Satisfactory
Substructure
6
Satisfactory

Bridge Details

Structure #
B120248G0DOTNBI
Year Built
2004
Length
108.4 m (355.6 ft)
Max Span
55.7 m
Width
22.5 m (73.8 ft)
Lanes
4
Daily Traffic
12,400
Material
Steel Continuous
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$3,397,000
Total Project Cost
$5,096,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.