HWY HARRISON BLV over ST 24

POND/CENTRAL ST BEYOND · County 021, Massachusetts · Built 1996 · 4 Lanes · 32,857 vehicles/day

Overall
Fair
Deck
7
Good
Superstructure
5
Fair
Substructure
7
Good

Bridge Details

Structure #
A18001AE8DOTNBI
Year Built
1996
Length
53.6 m (175.9 ft)
Max Span
25.9 m
Width
27.3 m (89.6 ft)
Lanes
4
Daily Traffic
32,857
Material
Steel Continuous
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$9,571,000
Total Project Cost
$14,357,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.