ST 24 over HWY OAK ST

.3 MI.N OF ST 27 · County 023, Massachusetts · Built 1955 · 6 Lanes · 118,909 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
6
Satisfactory
Substructure
6
Satisfactory

Bridge Details

Structure #
B250543N1DOTNBI
Year Built
1955
Length
21 m (68.9 ft)
Max Span
19.5 m
Width
33.2 m (108.9 ft)
Lanes
6
Daily Traffic
118,909
Material
Steel
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$69,000
Total Project Cost
$104,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.