ST 27 REYNOLDS MEM over ST 24

ST 27 AT ST 24 · County 023, Massachusetts · Built 1954 · 6 Lanes · 48,750 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
6
Satisfactory
Substructure
7
Good

Bridge Details

Structure #
B250523VRDOTNBI
Year Built
1954
Length
38.4 m (126 ft)
Max Span
18.9 m
Width
26.2 m (86 ft)
Lanes
6
Daily Traffic
48,750
Material
Concrete Continuous
Design
Frame (except frame culverts)
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$6,634,000
Total Project Cost
$9,952,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.