HWY FIELD ST over RR MBTA/CSX

.1 MI E OF RTE 28 · County 023, Massachusetts · Built 1894 · 2 Lanes · 4,655 vehicles/day

Overall
Fair
Deck
7
Good
Superstructure
8
Very Good
Substructure
6
Satisfactory

Bridge Details

Structure #
B250224CFDOT634
Year Built
1894
Reconstructed
1997
Length
24 m (78.7 ft)
Max Span
22.3 m
Width
14.1 m (46.3 ft)
Lanes
2
Daily Traffic
4,655
Material
Steel
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$2,289,000
Total Project Cost
$3,434,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.