ST139 LINDELOF AVE over ST 24
.4 MI S CANTON T.L. · County 021, Massachusetts · Built 1956 · 4 Lanes · 26,571 vehicles/day
Overall
Deck
7
Good
Superstructure
6
Satisfactory
Substructure
7
Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 7 | Good |
| Superstructure | 6 | Satisfactory |
| Substructure | 7 | Good |
Location
42.157128, -71.068958
This bridge is in worse condition than 29.2% of bridges in County 021. The average bridge in Massachusetts is 0 years old; this one is 70 years old.
Nearby Bridges
ST 24 over HWY PAGE ST
Built 1956
ST 28 N MAIN ST over OTHER BIKE PATH
Built 1951
ST 24 SB over HWY CANTON ST
Built 1957
ST 24 NB over HWY CANTON ST
Built 1957
HWY HARRISON BLV over ST 24
Built 1996
HWY MDC ACCSS RD over ST 24
Built 2011
ST 24 NB CURVE G over ST 24 SB CURVE S
Built 1958
I 93 NB/US1NB over ST 24 SB
Built 1958
I 93 NB/US1SB over ST 24 NB
Built 1958
I 93 NB/US1NB over ST 28 N MAIN ST
Built 1958
Bridge Details
- Structure #
- S280093WHDOTNBI
- Year Built
- 1956
- Reconstructed
- 2010
- Length
- 81.1 m (266.1 ft)
- Max Span
- 28.3 m
- Width
- 26.4 m (86.6 ft)
- Lanes
- 4
- Daily Traffic
- 26,571
- Material
- Steel
- Design
- Stringer/Multi-beam or Girder
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $2,811,000
- Total Project Cost
- $4,217,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.