I 93 NB/US1SB over ST 24 NB

I 93 AT ST 24 · County 021, Massachusetts · Built 1958 · 3 Lanes · 101,100 vehicles/day

Structurally Deficient — One or more key components rated 4 (Poor) or below
Overall
Poor
Deck
5
Fair
Superstructure
4
Poor
Substructure
6
Satisfactory

Bridge Details

Structure #
R01005359DOTNBI
Year Built
1958
Length
64.6 m (211.9 ft)
Max Span
27.7 m
Width
17.7 m (58.1 ft)
Lanes
3
Daily Traffic
101,100
Material
Steel Continuous
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$13,374,000
Total Project Cost
$20,062,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.