I 93 NB/US1NB over ST 28 N MAIN ST

I 93 NB AT ST 28 · County 021, Massachusetts · Built 1958 · 5 Lanes · 129,100 vehicles/day

Overall
Fair
Deck
5
Fair
Superstructure
5
Fair
Substructure
6
Satisfactory

Bridge Details

Structure #
R01009358DOTNBI
Year Built
1958
Length
49.7 m (163.1 ft)
Max Span
27.7 m
Width
22 m (72.2 ft)
Lanes
5
Daily Traffic
129,100
Material
Steel
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$7,142,000
Total Project Cost
$10,714,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.