HWY ESSEX ST over WATER SHAWSHEEN RIVER

AT SHAWSHEEN RD INT. · County 009, Massachusetts · Built 1875 · 2 Lanes · 18,225 vehicles/day

Overall
Fair
Superstructure
5
Fair
Substructure
5
Fair

Bridge Details

Structure #
A090062QMMUNNBI
Year Built
1875
Reconstructed
1918
Length
8.5 m (27.9 ft)
Max Span
8.5 m
Width
15.2 m (49.9 ft)
Lanes
2
Daily Traffic
18,225
Material
Masonry
Design
Arch - Deck
Owner
Town or Township Highway Agency
Last Inspected
N/A
Est. Improvement
$889,000
Total Project Cost
$1,334,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.