HWY ESSEX ST over WATER SHAWSHEEN RIVER
AT SHAWSHEEN RD INT. · County 009, Massachusetts · Built 1875 · 2 Lanes · 18,225 vehicles/day
Overall
Superstructure
5
Fair
Substructure
5
Fair
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Superstructure | 5 | Fair |
| Substructure | 5 | Fair |
Location
42.657247, -71.146867
This bridge is in worse condition than 39.1% of bridges in County 009. The average bridge in Massachusetts is 0 years old; this one is 151 years old.
Nearby Bridges
ST 28 N MAIN ST over RR MBTA/BMRR
Built 1929
HWY STEVENS ST over WATER SHAWSHEEN RIVER
Built 1900
HWY HARDING ST over RR MBTA/BMRR
Built 1996
ST 28 N MAIN ST over WATER SHAWSHEEN RIVER
Built 1879
HWY CENTRAL ST over WATER SHAWSHEEN RIVER
Built 1850
HWY BALMORAL ST over WATER SHAWSHEEN RIVER
Built 1924
ST133 HAVERHILL ST over WATER SHAWSHEEN RIVER
Built 1921
I 495 NB over ST 28 SB/N MAIN ST
Built 1962
I 495 NB over ST 28 NB/UNION ST
Built 1962
HWY CORBETT ST over I 495
Built 1962
Bridge Details
- Structure #
- A090062QMMUNNBI
- Year Built
- 1875
- Reconstructed
- 1918
- Length
- 8.5 m (27.9 ft)
- Max Span
- 8.5 m
- Width
- 15.2 m (49.9 ft)
- Lanes
- 2
- Daily Traffic
- 18,225
- Material
- Masonry
- Design
- Arch - Deck
- Owner
- Town or Township Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $889,000
- Total Project Cost
- $1,334,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.