HWY CENTRAL ST over WATER SHAWSHEEN RIVER

AT SHAWSHEEN RIVER · County 009, Massachusetts · Built 1850 · 2 Lanes · 13,319 vehicles/day

Overall
Fair
Deck
7
Good
Superstructure
6
Satisfactory
Substructure
6
Satisfactory

Bridge Details

Structure #
A090032QKMUNNBI
Year Built
1850
Reconstructed
1993
Length
11.3 m (37.1 ft)
Max Span
10.7 m
Width
9.8 m (32.2 ft)
Lanes
2
Daily Traffic
13,319
Material
Steel
Design
Stringer/Multi-beam or Girder
Owner
Town or Township Highway Agency
Last Inspected
N/A
Est. Improvement
$1,141,000
Total Project Cost
$1,712,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.