HWY HARDING ST over RR MBTA/BMRR
.2 MILES E ST 28 · County 009, Massachusetts · Built 1996 · 2 Lanes · 7,900 vehicles/day
Overall
Deck
6
Satisfactory
Superstructure
6
Satisfactory
Substructure
6
Satisfactory
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 6 | Satisfactory |
| Superstructure | 6 | Satisfactory |
| Substructure | 6 | Satisfactory |
Location
42.662653, -71.143097
This bridge is in worse condition than 17.7% of bridges in County 009. The average bridge in Massachusetts is 0 years old; this one is 30 years old.
Nearby Bridges
ST 28 N MAIN ST over RR MBTA/BMRR
Built 1929
HWY STEVENS ST over WATER SHAWSHEEN RIVER
Built 1900
ST 28 N MAIN ST over WATER SHAWSHEEN RIVER
Built 1879
HWY ESSEX ST over WATER SHAWSHEEN RIVER
Built 1875
HWY BALMORAL ST over WATER SHAWSHEEN RIVER
Built 1924
ST133 HAVERHILL ST over WATER SHAWSHEEN RIVER
Built 1921
HWY CENTRAL ST over WATER SHAWSHEEN RIVER
Built 1850
I 495 NB over ST 28 NB/UNION ST
Built 1962
I 495 NB over ST 28 SB/N MAIN ST
Built 1962
I 495 SB over ST 28 NB/UNION ST
Built 1962
Bridge Details
- Structure #
- A09010AKBDOT634
- Year Built
- 1996
- Length
- 14.3 m (46.9 ft)
- Max Span
- 14 m
- Width
- 12.3 m (40.4 ft)
- Lanes
- 2
- Daily Traffic
- 7,900
- Material
- Prestressed Concrete
- Design
- Slab
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $1,146,000
- Total Project Cost
- $1,720,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.