ST 28 N MAIN ST over RR MBTA/BMRR

.4 MI N ANDOVER CENTER · County 009, Massachusetts · Built 1929 · 3 Lanes · 22,800 vehicles/day

Overall
Fair
Deck
7
Good
Superstructure
7
Good
Substructure
6
Satisfactory

Bridge Details

Structure #
A09011331DOT634
Year Built
1929
Reconstructed
2018
Length
25.4 m (83.3 ft)
Max Span
24.3 m
Width
18.2 m (59.7 ft)
Lanes
3
Daily Traffic
22,800
Material
Steel
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
$0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.