ST150 MAIN ST over WATER POWWOW RIVER

IN CENTER OF TOWN · County 009, Massachusetts · Built 1850 · 4 Lanes · 12,700 vehicles/day

Overall
Fair
Superstructure
6
Satisfactory
Substructure
5
Fair

Bridge Details

Structure #
A070052Y7DOTNBI
Year Built
1850
Length
7.6 m (24.9 ft)
Max Span
7.6 m
Width
17.7 m (58.1 ft)
Lanes
4
Daily Traffic
12,700
Material
Masonry
Design
Arch - Deck
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$920,000
Total Project Cost
$1,381,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.