HWY THOMPSON ST over WATER POWWOW RIVER

1.2MI N OF RT.495 · County 009, Massachusetts · Built 2005 · 2 Lanes · 387 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
A07004AY0MUNNBI
Year Built
2005
Length
14.8 m (48.6 ft)
Max Span
13.4 m
Width
8.8 m (28.9 ft)
Lanes
2
Daily Traffic
387
Material
Prestressed Concrete
Design
Slab
Owner
Town or Township Highway Agency
Last Inspected
N/A
Est. Improvement
$1,076,000
Total Project Cost
$1,615,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.