ST110 MACY ST over WATER POWWOW RIVER

1 MI W OF I-95 · County 009, Massachusetts · Built 1967 · 2 Lanes · 18,400 vehicles/day

Overall
Fair
Deck
5
Fair
Superstructure
5
Fair
Substructure
6
Satisfactory

Bridge Details

Structure #
A070312YCDOTNBI
Year Built
1967
Length
24.4 m (80.1 ft)
Max Span
22.9 m
Width
16.5 m (54.1 ft)
Lanes
2
Daily Traffic
18,400
Material
Steel
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$2,678,000
Total Project Cost
$4,018,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.