I 495 SB over ST110

AT EXIT 55 · County 009, Massachusetts · Built 1964 · 3 Lanes · 62,287 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
5
Fair
Substructure
6
Satisfactory

Bridge Details

Structure #
A070252WHDOTNBI
Year Built
1964
Length
61 m (200.1 ft)
Max Span
29 m
Width
17.1 m (56.1 ft)
Lanes
3
Daily Traffic
62,287
Material
Steel
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$6,883,000
Total Project Cost
$10,325,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.