I 495 SB over HWY MAIN ST

.6 MI N EXIT 54 · County 009, Massachusetts · Built 1964 · 3 Lanes · 35,000 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
6
Satisfactory
Substructure
5
Fair

Bridge Details

Structure #
A070242WCDOTNBI
Year Built
1964
Length
36 m (118.1 ft)
Max Span
17.1 m
Width
17.1 m (56.1 ft)
Lanes
3
Daily Traffic
35,000
Material
Steel
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$4,108,000
Total Project Cost
$6,163,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.