HWY CLINTON ST over WATER BACK RIVER

2.4 KM W OF I-95 · County 009, Massachusetts · Built 2001 · 2 Lanes · 2,500 vehicles/day

Overall
Good
Deck
8
Very Good
Superstructure
8
Very Good
Substructure
7
Good

Bridge Details

Structure #
A07007AE4MUNNBI
Year Built
2001
Length
22.7 m (74.5 ft)
Max Span
22.7 m
Width
11 m (36.1 ft)
Lanes
2
Daily Traffic
2,500
Material
Prestressed Concrete
Design
Box Beam or Girders - Single or Spread
Owner
Town or Township Highway Agency
Last Inspected
N/A
Est. Improvement
$1,721,000
Total Project Cost
$2,582,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.