E 81ST S over E. BRANCH SAND CREEK
3.0 S. 1.9 W. AMMON · County 019, Idaho · Built 1964 · 2 Lanes · 150 vehicles/day
Overall
Deck
5
Fair
Superstructure
5
Fair
Substructure
6
Satisfactory
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 5 | Fair |
| Superstructure | 5 | Fair |
| Substructure | 6 | Satisfactory |
Location
43.424403, -112.001722
This bridge is in worse condition than 78.4% of bridges in County 019. The average bridge in Idaho is 0 years old; this one is 62 years old.
Nearby Bridges
STC 6705; S 15TH E over SAND CREEK
Built 1952
STC6705;ST CLAIR over W. BRANCH SAND CREEK
Built 1966
STC 6703; E 65TH S over E.FK. SAND CREEK
Built 1978
STC 6703; E 65TH S over WEST FORK SAND CREEK
Built 1973
STC 6712;S 25TH E over TAYLOR CANAL
Built 1949
STC 6703;E 65TH S over IDAHO CANAL
Built 1950
81ST SOUTH ROAD over TAYLOR CANAL
Built 1970
STC 6707; E 97TH S over SAND CREEK
Built 1969
STC6707; E 97TH S over IDAHO CANAL
Built 2022
PALOMINO DRIVE over SAND CREEK
Built 2003
Bridge Details
- Structure #
- 000000000031015
- Year Built
- 1964
- Length
- 6.1 m (20 ft)
- Max Span
- 6.1 m
- Width
- 8 m (26.2 ft)
- Lanes
- 2
- Daily Traffic
- 150
- Material
- Concrete
- Design
- Frame (except frame culverts)
- Owner
- County Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $189,000
- Total Project Cost
- $284,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.