STC6705;ST CLAIR over W. BRANCH SAND CREEK
3.8 S. 1.9 E. IDAHO FALLS · County 019, Idaho · Built 1966 · 2 Lanes · 2,500 vehicles/day
Overall
Deck
6
Satisfactory
Superstructure
6
Satisfactory
Substructure
7
Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 6 | Satisfactory |
| Superstructure | 6 | Satisfactory |
| Substructure | 7 | Good |
Location
43.436308, -112.003933
This bridge is in worse condition than 32.4% of bridges in County 019. The average bridge in Idaho is 0 years old; this one is 60 years old.
Nearby Bridges
STC 6703; E 65TH S over WEST FORK SAND CREEK
Built 1973
STC 6703;E 65TH S over IDAHO CANAL
Built 1950
STC 6703; E 65TH S over E.FK. SAND CREEK
Built 1978
SANDPIPER WAY over W FK SAND CREEK
Built 2021
E 81ST S over E. BRANCH SAND CREEK
Built 1964
STC 6705; S 15TH E over SAND CREEK
Built 1952
TOWNSHIP ROAD over IDAHO CANAL
Built 1972
E 49TH S over W.FK. SAND CREEK
Built 1978
E 49TH S over E.FK. SAND CREEK
Built 1977
81ST SOUTH ROAD over TAYLOR CANAL
Built 1970
Bridge Details
- Structure #
- 000000000020800
- Year Built
- 1966
- Length
- 13.4 m (44 ft)
- Max Span
- 12.8 m
- Width
- 11.9 m (39 ft)
- Lanes
- 2
- Daily Traffic
- 2,500
- Material
- Prestressed Concrete
- Design
- Stringer/Multi-beam or Girder
- Owner
- City or Municipal Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $464,000
- Total Project Cost
- $696,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.