STC 6712;S 25TH E over TAYLOR CANAL
4.48 S. AMMON · County 019, Idaho · Built 1949 · 2 Lanes · 1,700 vehicles/day
Overall
Deck
6
Satisfactory
Superstructure
6
Satisfactory
Substructure
7
Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 6 | Satisfactory |
| Superstructure | 6 | Satisfactory |
| Substructure | 7 | Good |
Location
43.414111, -111.984
This bridge is in worse condition than 32.4% of bridges in County 019. The average bridge in Idaho is 0 years old; this one is 77 years old.
Nearby Bridges
81ST SOUTH ROAD over TAYLOR CANAL
Built 1970
E 81ST S over E. BRANCH SAND CREEK
Built 1964
STC 6705; S 15TH E over SAND CREEK
Built 1952
STC 6703; E 65TH S over E.FK. SAND CREEK
Built 1978
STC6705;ST CLAIR over W. BRANCH SAND CREEK
Built 1966
STC 6707; E 97TH S over SAND CREEK
Built 1969
STC 6703; E 65TH S over WEST FORK SAND CREEK
Built 1973
STC6707; E 97TH S over IDAHO CANAL
Built 2022
STC 6703;E 65TH S over IDAHO CANAL
Built 1950
STC 6705;E 113TH S over IDAHO CANAL
Built 1977
Bridge Details
- Structure #
- 000000000020808
- Year Built
- 1949
- Length
- 7 m (23 ft)
- Max Span
- 7 m
- Width
- 8.5 m (27.9 ft)
- Lanes
- 2
- Daily Traffic
- 1,700
- Material
- Concrete
- Design
- Frame (except frame culverts)
- Owner
- County Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $305,000
- Total Project Cost
- $458,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.