STC 6707; E 97TH S over SAND CREEK

2.0 N. 0.75 E.TAYLORVILLE · County 019, Idaho · Built 1969 · 2 Lanes · 910 vehicles/day

Overall
Fair
Deck
7
Good
Superstructure
6
Satisfactory
Substructure
7
Good

Bridge Details

Structure #
000000000020775
Year Built
1969
Length
12.2 m (40 ft)
Max Span
11.6 m
Width
11 m (36.1 ft)
Lanes
2
Daily Traffic
910
Material
Prestressed Concrete
Design
Tee Beam
Owner
County Highway Agency
Last Inspected
N/A
Est. Improvement
$348,000
Total Project Cost
$528,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.