STC 6851; S 1ST E over SAND CREEK
2.5 N. TAYLOR · County 019, Idaho · Built 1962 · 2 Lanes · 1,300 vehicles/day
Overall
Deck
8
Very Good
Superstructure
7
Good
Substructure
6
Satisfactory
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 8 | Very Good |
| Superstructure | 7 | Good |
| Substructure | 6 | Satisfactory |
Location
43.417886, -112.033692
This bridge is in worse condition than 32.4% of bridges in County 019. The average bridge in Idaho is 0 years old; this one is 64 years old.
Nearby Bridges
PALOMINO DRIVE over SAND CREEK
Built 2003
CANYON ROAD over W. BRANCH SAND CREEK
Built 1973
STC6707; E 97TH S over IDAHO CANAL
Built 2022
PARK ROAD over LITTLE SAND CREEK
Built 1978
STC 6707; E 97TH S over SAND CREEK
Built 1969
STC 6851; S 1ST E over SAND CREEK
Built 1962
STC 6705; S 15TH E over SAND CREEK
Built 1952
W 113TH S over E. BRANCH SAND CREEK
Built 1999
STC 6705;E 113TH S over IDAHO CANAL
Built 1977
E 81ST S over E. BRANCH SAND CREEK
Built 1964
Bridge Details
- Structure #
- 000000000021140
- Year Built
- 1962
- Length
- 12.8 m (42 ft)
- Max Span
- 12.2 m
- Width
- 9.2 m (30.2 ft)
- Lanes
- 2
- Daily Traffic
- 1,300
- Material
- Prestressed Concrete
- Design
- Tee Beam
- Owner
- County Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $444,000
- Total Project Cost
- $665,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.