STC 6851; S 1ST E over SAND CREEK

2.5 N. TAYLOR · County 019, Idaho · Built 1962 · 2 Lanes · 1,300 vehicles/day

Overall
Fair
Deck
8
Very Good
Superstructure
7
Good
Substructure
6
Satisfactory

Bridge Details

Structure #
000000000021140
Year Built
1962
Length
12.8 m (42 ft)
Max Span
12.2 m
Width
9.2 m (30.2 ft)
Lanes
2
Daily Traffic
1,300
Material
Prestressed Concrete
Design
Tee Beam
Owner
County Highway Agency
Last Inspected
N/A
Est. Improvement
$444,000
Total Project Cost
$665,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.