STC6707; E 97TH S over IDAHO CANAL
2.0 N 0.5 E TAYLORVILLE · County 019, Idaho · Built 2022 · 2 Lanes · 910 vehicles/day
Overall
Deck
8
Very Good
Superstructure
8
Very Good
Substructure
8
Very Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 8 | Very Good |
| Superstructure | 8 | Very Good |
| Substructure | 8 | Very Good |
Location
43.41, -112.023972
This bridge is in worse condition than 4.2% of bridges in County 019. The average bridge in Idaho is 0 years old; this one is 4 years old.
Nearby Bridges
STC 6707; E 97TH S over SAND CREEK
Built 1969
STC 6851; S 1ST E over SAND CREEK
Built 1962
STC 6851; S 1ST E over SAND CREEK
Built 1962
PALOMINO DRIVE over SAND CREEK
Built 2003
CANYON ROAD over W. BRANCH SAND CREEK
Built 1973
PARK ROAD over LITTLE SAND CREEK
Built 1978
STC 6705;E 113TH S over IDAHO CANAL
Built 1977
W 113TH S over E. BRANCH SAND CREEK
Built 1999
STC 6705; S 15TH E over SAND CREEK
Built 1952
E 121 ST S over IDAHO CANAL; HAMPTON BR
Built 2023
Bridge Details
- Structure #
- 000000000020771
- Year Built
- 2022
- Length
- 13.4 m (44 ft)
- Max Span
- 12.4 m
- Width
- 12.2 m (40 ft)
- Lanes
- 2
- Daily Traffic
- 910
- Material
- Prestressed Concrete
- Design
- Box Beam or Girders - Multiple
- Owner
- County Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- N/A
- Total Project Cost
- N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.