2500 NORTH ROAD over SALMON LATERAL NO.1
0.5 N. 2.0 E. HOLLISTER · County 083, Idaho · Built 1978 · 2 Lanes · 40 vehicles/day
Overall
Deck
6
Satisfactory
Superstructure
7
Good
Substructure
7
Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 6 | Satisfactory |
| Superstructure | 7 | Good |
| Substructure | 7 | Good |
Location
42.360347, -114.537028
This bridge is in worse condition than 13.5% of bridges in County 083. The average bridge in Idaho is 0 years old; this one is 48 years old.
Nearby Bridges
N 2700 E over MAIN CANAL
Built 1965
2300 EAST ROAD over SALMON CANAL LATERAL #2
Built 1983
US 93 over LATERAL NO. 1
Built 2006
US 93 over HIGH LINE CANAL
Built 1956
2500 NORTH ROAD over SALMON LATERAL NO.21
Built 1970
2300 EAST ROAD over SALMON CANAL LATERAL #2
Built 1971
2200 NORTH ROAD over SALMON MAIN CANAL
Built 1971
1900 EAST ROAD over SALMON RIVER CANAL
Built 1980
2800 EAST RD over HIGH LINE CANAL
Built 1972
STC2729;3400 N. RD over HIGH LINE CANAL
Built 1964
Bridge Details
- Structure #
- 000000000025525
- Year Built
- 1978
- Length
- 7.9 m (25.9 ft)
- Max Span
- 7.6 m
- Width
- 8.2 m (26.9 ft)
- Lanes
- 2
- Daily Traffic
- 40
- Material
- Prestressed Concrete
- Design
- Tee Beam
- Owner
- Other Local Agencies
- Last Inspected
- N/A
- Est. Improvement
- N/A
- Total Project Cost
- N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.