2300 EAST ROAD over SALMON CANAL LATERAL #2
1.8 S. 1.0 W. HOLLISTER · County 083, Idaho · Built 1971 · 2 Lanes · 90 vehicles/day
Overall
Deck
7
Good
Superstructure
5
Fair
Substructure
6
Satisfactory
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 7 | Good |
| Superstructure | 5 | Fair |
| Substructure | 6 | Satisfactory |
Location
42.325642, -114.594253
This bridge is in worse condition than 65.9% of bridges in County 083. The average bridge in Idaho is 0 years old; this one is 55 years old.
Nearby Bridges
US 93 over LATERAL NO. 1
Built 2006
US 93 over HIGH LINE CANAL
Built 1956
2200 NORTH ROAD over SALMON MAIN CANAL
Built 1971
2500 NORTH ROAD over SALMON LATERAL NO.21
Built 1970
2300 EAST ROAD over SALMON CANAL LATERAL #2
Built 1983
2500 NORTH ROAD over SALMON LATERAL NO.1
Built 1978
N 2700 E over MAIN CANAL
Built 1965
1900 EAST ROAD over SALMON RIVER CANAL
Built 1980
Bridge Details
- Structure #
- 000000000025635
- Year Built
- 1971
- Length
- 17.7 m (58.1 ft)
- Max Span
- 8.5 m
- Width
- 8.7 m (28.5 ft)
- Lanes
- 2
- Daily Traffic
- 90
- Material
- Prestressed Concrete
- Design
- Tee Beam
- Owner
- Other Local Agencies
- Last Inspected
- N/A
- Est. Improvement
- $379,000
- Total Project Cost
- $569,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.