N 2700 E over MAIN CANAL
3.0 E 1.0 N HOLLISTER · County 083, Idaho · Built 1965 · 2 Lanes · 460 vehicles/day
Overall
Deck
6
Satisfactory
Superstructure
5
Fair
Substructure
5
Fair
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 6 | Satisfactory |
| Superstructure | 5 | Fair |
| Substructure | 5 | Fair |
Location
42.367556, -114.516056
This bridge is in worse condition than 65.9% of bridges in County 083. The average bridge in Idaho is 0 years old; this one is 61 years old.
Nearby Bridges
2500 NORTH ROAD over SALMON LATERAL NO.1
Built 1978
2300 EAST ROAD over SALMON CANAL LATERAL #2
Built 1983
US 93 over HIGH LINE CANAL
Built 1956
US 93 over LATERAL NO. 1
Built 2006
2500 NORTH ROAD over SALMON LATERAL NO.21
Built 1970
2300 EAST ROAD over SALMON CANAL LATERAL #2
Built 1971
2200 NORTH ROAD over SALMON MAIN CANAL
Built 1971
3200 EAST RD over HIGH LINE CANAL
Built 1969
2800 EAST RD over HIGH LINE CANAL
Built 1972
STC2730;3000 E. RD over HIGH LINE CANAL
Built 1964
Bridge Details
- Structure #
- 000000000025523
- Year Built
- 1965
- Reconstructed
- 1985
- Length
- 7.6 m (24.9 ft)
- Max Span
- 7 m
- Width
- 9.8 m (32.2 ft)
- Lanes
- 2
- Daily Traffic
- 460
- Material
- Concrete
- Design
- Slab
- Owner
- Other Local Agencies
- Last Inspected
- N/A
- Est. Improvement
- $175,000
- Total Project Cost
- $263,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.