2500 NORTH ROAD over SALMON LATERAL NO.21
0.5 N. 1.5 W. HOLLISTER · County 083, Idaho · Built 1970 · 2 Lanes · 60 vehicles/day
Overall
Deck
7
Good
Superstructure
6
Satisfactory
Substructure
6
Satisfactory
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 7 | Good |
| Superstructure | 6 | Satisfactory |
| Substructure | 6 | Satisfactory |
Location
42.360381, -114.603014
This bridge is in worse condition than 13.5% of bridges in County 083. The average bridge in Idaho is 0 years old; this one is 56 years old.
Nearby Bridges
2300 EAST ROAD over SALMON CANAL LATERAL #2
Built 1983
2300 EAST ROAD over SALMON CANAL LATERAL #2
Built 1971
US 93 over LATERAL NO. 1
Built 2006
US 93 over HIGH LINE CANAL
Built 1956
2200 NORTH ROAD over SALMON MAIN CANAL
Built 1971
2500 NORTH ROAD over SALMON LATERAL NO.1
Built 1978
N 2700 E over MAIN CANAL
Built 1965
1900 EAST ROAD over SALMON RIVER CANAL
Built 1980
STC2729;3400 N. RD over HIGH LINE CANAL
Built 1964
Bridge Details
- Structure #
- 000000000025425
- Year Built
- 1970
- Length
- 9.8 m (32.2 ft)
- Max Span
- 9.4 m
- Width
- 8.5 m (27.9 ft)
- Lanes
- 2
- Daily Traffic
- 60
- Material
- Prestressed Concrete
- Design
- Tee Beam
- Owner
- Other Local Agencies
- Last Inspected
- N/A
- Est. Improvement
- $330,000
- Total Project Cost
- $495,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.