2800 EAST RD over HIGH LINE CANAL
4.8 S. 1.5 W. TWIN FALLS · County 083, Idaho · Built 1972 · 2 Lanes · 90 vehicles/day
Overall
Deck
7
Good
Superstructure
6
Satisfactory
Substructure
6
Satisfactory
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 7 | Good |
| Superstructure | 6 | Satisfactory |
| Substructure | 6 | Satisfactory |
Location
42.487564, -114.499725
This bridge is in worse condition than 13.5% of bridges in County 083. The average bridge in Idaho is 0 years old; this one is 54 years old.
Nearby Bridges
STC2735;2900 E. RD over HIGH LINE CANAL
Built 2006
STC2729;3400 N. RD over HIGH LINE CANAL
Built 1964
2800 EAST ROAD over LOW LINE CANAL
Built 1980
2700 EAST ROAD over LOW LINE CANAL
Built 1967
STC2730;3000 E. RD over HIGH LINE CANAL
Built 1964
STC2735;2900 EAST over LOW LINE CANAL
Built 2010
STC2730;3000 E. RD over LOW LINE CANAL
Built 1964
3100 EAST ROAD over LOW LINE CANAL
Built 1965
2600 EAST RD over LOW LINE CANAL
Built 1968
2500 EAST ROAD over HIGH LINE CANAL
Built 1964
Bridge Details
- Structure #
- 000000000025515
- Year Built
- 1972
- Length
- 23.8 m (78.1 ft)
- Max Span
- 11.6 m
- Width
- 8.5 m (27.9 ft)
- Lanes
- 2
- Daily Traffic
- 90
- Material
- Prestressed Concrete
- Design
- Tee Beam
- Owner
- Other Local Agencies
- Last Inspected
- N/A
- Est. Improvement
- $660,000
- Total Project Cost
- $990,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.