2800 EAST ROAD over LOW LINE CANAL

3.0 S. 1.5 W. TWIN FALLS · County 083, Idaho · Built 1980 · 2 Lanes · 140 vehicles/day

Overall
Fair
Deck
7
Good
Superstructure
6
Satisfactory
Substructure
6
Satisfactory

Bridge Details

Structure #
000000000025555
Year Built
1980
Length
24.1 m (79.1 ft)
Max Span
11.9 m
Width
9.8 m (32.2 ft)
Lanes
2
Daily Traffic
140
Material
Prestressed Concrete
Design
Tee Beam
Owner
Other Local Agencies
Last Inspected
N/A
Est. Improvement
$476,000
Total Project Cost
$714,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.