850 EAST ROAD over EAST MAIN CANAL
7.3 N. 4.0 W. RICHFIELD · County 063, Idaho · Built 1965 · 1 Lanes · 30 vehicles/day
Structurally Deficient
— One or more key components rated 4 (Poor) or below
Overall
Deck
7
Good
Superstructure
5
Fair
Substructure
3
Serious
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 7 | Good |
| Superstructure | 5 | Fair |
| Substructure | 3 | Serious |
Location
43.151969, -114.234119
This bridge is in worse condition than 96.2% of bridges in County 063. The average bridge in Idaho is 0 years old; this one is 61 years old.
Nearby Bridges
1420 NORTH ROAD over EAST MAIN CANAL
Built 2013
1150 EAST ROAD over EAST MAIN CANAL
Built 1977
1320 NORTH ROAD over EAST MAIN CANAL
Built 1950
BURMAH ROAD over LINCOLN CANAL
Built 1974
1220 NORTH ROAD over EAST MAIN CANAL
Built 2024
STATE HAUL ROAD over LINCOLN CANAL
Built 1980
OLD HIGHWAY 93 over BIG WOOD RIVER
Built 1945
SH 75 over BIG WOOD RIVER
Built 1955
OLD HIGHWAY 93 over RICHFIELD CANAL
Built 1932
SH 75 over RICHFIELD CANAL
Built 1955
Bridge Details
- Structure #
- 000000000024970
- Year Built
- 1965
- Length
- 12.2 m (40 ft)
- Max Span
- 6.1 m
- Width
- 6.2 m (20.3 ft)
- Lanes
- 1
- Daily Traffic
- 30
- Material
- Steel Continuous
- Design
- Stringer/Multi-beam or Girder
- Owner
- Other Local Agencies
- Last Inspected
- N/A
- Est. Improvement
- $292,000
- Total Project Cost
- $438,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.