OLD HIGHWAY 93 over RICHFIELD CANAL
18.3 S. 2.7 W. BELLEVUE · County 013, Idaho · Built 1932 · 2 Lanes · 10 vehicles/day
Structurally Deficient
— One or more key components rated 4 (Poor) or below
Overall
Deck
6
Satisfactory
Superstructure
6
Satisfactory
Substructure
4
Poor
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 6 | Satisfactory |
| Superstructure | 6 | Satisfactory |
| Substructure | 4 | Poor |
Location
43.200794, -114.316664
This bridge is in worse condition than 95.8% of bridges in County 013. The average bridge in Idaho is 0 years old; this one is 94 years old.
Nearby Bridges
SH 75 over RICHFIELD CANAL
Built 1955
OLD HIGHWAY 93 over BIG WOOD RIVER
Built 1945
SH 75 over BIG WOOD RIVER
Built 1955
STATE HAUL ROAD over LINCOLN CANAL
Built 1980
BURMAH ROAD over LINCOLN CANAL
Built 1974
850 EAST ROAD over EAST MAIN CANAL
Built 1965
1420 NORTH ROAD over EAST MAIN CANAL
Built 2013
1150 EAST ROAD over EAST MAIN CANAL
Built 1977
US 20 over BIG WOOD RIVER
Built 2017
1320 NORTH ROAD over EAST MAIN CANAL
Built 1950
Bridge Details
- Structure #
- 000000000023675
- Year Built
- 1932
- Length
- 31.1 m (102 ft)
- Max Span
- 9.8 m
- Width
- 8.5 m (27.9 ft)
- Lanes
- 2
- Daily Traffic
- 10
- Material
- Concrete
- Design
- Tee Beam
- Owner
- County Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $601,000
- Total Project Cost
- $901,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.