SH 75 over RICHFIELD CANAL

18.7 N. SHOSHONE · County 013, Idaho · Built 1955 · 2 Lanes · 4,500 vehicles/day

Overall
Fair
Deck
5
Fair
Superstructure
5
Fair
Substructure
6
Satisfactory

Bridge Details

Structure #
000000000017640
Year Built
1955
Length
27.4 m (89.9 ft)
Max Span
8.8 m
Width
11.1 m (36.4 ft)
Lanes
2
Daily Traffic
4,500
Material
Concrete
Design
Tee Beam
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$759,000
Total Project Cost
$1,139,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.