SH 75 over BIG WOOD RIVER
17.9 N. SHOSHONE · County 063, Idaho · Built 1955 · 2 Lanes · 4,500 vehicles/day
Overall
Deck
6
Satisfactory
Superstructure
5
Fair
Substructure
5
Fair
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 6 | Satisfactory |
| Superstructure | 5 | Fair |
| Substructure | 5 | Fair |
Location
43.190403, -114.322664
This bridge is in worse condition than 60.4% of bridges in County 063. The average bridge in Idaho is 0 years old; this one is 71 years old.
Nearby Bridges
OLD HIGHWAY 93 over BIG WOOD RIVER
Built 1945
SH 75 over RICHFIELD CANAL
Built 1955
OLD HIGHWAY 93 over RICHFIELD CANAL
Built 1932
STATE HAUL ROAD over LINCOLN CANAL
Built 1980
BURMAH ROAD over LINCOLN CANAL
Built 1974
850 EAST ROAD over EAST MAIN CANAL
Built 1965
1420 NORTH ROAD over EAST MAIN CANAL
Built 2013
1150 EAST ROAD over EAST MAIN CANAL
Built 1977
1320 NORTH ROAD over EAST MAIN CANAL
Built 1950
1220 NORTH ROAD over EAST MAIN CANAL
Built 2024
Bridge Details
- Structure #
- 000000000017635
- Year Built
- 1955
- Length
- 30.5 m (100.1 ft)
- Max Span
- 12.2 m
- Width
- 11.1 m (36.4 ft)
- Lanes
- 2
- Daily Traffic
- 4,500
- Material
- Concrete
- Design
- Tee Beam
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $929,000
- Total Project Cost
- $1,394,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.