BUTTE ROUND ROAD over DESERT DRAIN
6.3 W. 0.8 N SPRINGFIELD · County 011, Idaho · Built 1979 · 2 Lanes · 150 vehicles/day
Overall
Deck
6
Satisfactory
Superstructure
6
Satisfactory
Substructure
5
Fair
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 6 | Satisfactory |
| Superstructure | 6 | Satisfactory |
| Substructure | 5 | Fair |
Location
43.091692, -112.8085
This bridge is in worse condition than 76% of bridges in County 011. The average bridge in Idaho is 0 years old; this one is 47 years old.
Nearby Bridges
SH 39 over LOW LINE CANAL
Built 1977
S 2400 W; ANDERSON over HIGH LINE CANAL
Built 1974
SH 39 over HIGHLINE CANAL
Built 1977
SH 39 over ABERDEEN SPRINGFIELD CNL
Built 1977
GRANDVIEW ROAD over HIGH LINE CANAL
Built 1971
VAMBAUR ROAD over LOW LINE CANAL
Built 1966
1000 SOUTH ROAD over LOW LINE CANAL
Built 1972
ANDERSON ROAD over LOW LINE CANAL
Built 1972
STERLING NORTH RD over ABERDEEN SPRINGFIELD CNL
Built 1982
STC1838;STERLING W over LOW LINE CANAL
Built 1983
Bridge Details
- Structure #
- 000000000022975
- Year Built
- 1979
- Length
- 6.7 m (22 ft)
- Max Span
- 6.1 m
- Width
- 9.7 m (31.8 ft)
- Lanes
- 2
- Daily Traffic
- 150
- Material
- Concrete
- Design
- Frame (except frame culverts)
- Owner
- County Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- N/A
- Total Project Cost
- N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.