GRANDVIEW ROAD over HIGH LINE CANAL
4.3 W. 1.0 N STERLING · County 011, Idaho · Built 1971 · 2 Lanes · 100 vehicles/day
Overall
Deck
7
Good
Superstructure
7
Good
Substructure
5
Fair
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 7 | Good |
| Superstructure | 7 | Good |
| Substructure | 5 | Fair |
Location
43.052953, -112.821761
This bridge is in worse condition than 76% of bridges in County 011. The average bridge in Idaho is 0 years old; this one is 55 years old.
Nearby Bridges
SH 39 over HIGHLINE CANAL
Built 1977
KENDELL RD;W1200S over HIGH LINE CANAL
Built 1980
UNDERWOOD ROAD over HIGH LINE CANAL
Built 1980
STC1838;STERLING W over LOW LINE CANAL
Built 1983
ANDERSON ROAD over LOW LINE CANAL
Built 1972
BUTTE ROUND ROAD over DESERT DRAIN
Built 1979
1000 SOUTH ROAD over LOW LINE CANAL
Built 1972
UNDERWOOD ROAD over HIGH LINE CANAL
Built 1970
SH 39 over LOW LINE CANAL
Built 1977
1300 SOUTH ROAD over LOW LINE CANAL
Built 1970
Bridge Details
- Structure #
- 000000000022440
- Year Built
- 1971
- Length
- 13.4 m (44 ft)
- Max Span
- 12.8 m
- Width
- 9.1 m (29.9 ft)
- Lanes
- 2
- Daily Traffic
- 100
- Material
- Prestressed Concrete
- Design
- Tee Beam
- Owner
- County Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $296,000
- Total Project Cost
- $444,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.