ANDERSON ROAD over LOW LINE CANAL
2.0 W. 0.5 N STERLING · County 011, Idaho · Built 1972 · 2 Lanes · 100 vehicles/day
Overall
Deck
7
Good
Superstructure
6
Satisfactory
Substructure
5
Fair
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 7 | Good |
| Superstructure | 6 | Satisfactory |
| Substructure | 5 | Fair |
Location
43.04555, -112.771772
This bridge is in worse condition than 76% of bridges in County 011. The average bridge in Idaho is 0 years old; this one is 54 years old.
Nearby Bridges
1000 SOUTH ROAD over LOW LINE CANAL
Built 1972
STC1838;STERLING W over LOW LINE CANAL
Built 1983
VAMBAUR ROAD over LOW LINE CANAL
Built 1966
SH 39 over HIGHLINE CANAL
Built 1977
SH 39 over LOW LINE CANAL
Built 1977
SH 39 over ABERDEEN SPRINGFIELD CNL
Built 1977
GRANDVIEW ROAD over HIGH LINE CANAL
Built 1971
S 2400 W; ANDERSON over HIGH LINE CANAL
Built 1974
1300 SOUTH ROAD over LOW LINE CANAL
Built 1970
UNDERWOOD ROAD over HIGH LINE CANAL
Built 1980
Bridge Details
- Structure #
- 000000000022400
- Year Built
- 1972
- Length
- 16.5 m (54.1 ft)
- Max Span
- 15.5 m
- Width
- 9.1 m (29.9 ft)
- Lanes
- 2
- Daily Traffic
- 100
- Material
- Prestressed Concrete
- Design
- Tee Beam
- Owner
- County Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $351,000
- Total Project Cost
- $527,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.