S 2400 W; ANDERSON over HIGH LINE CANAL
4.5 W. 0.2 N SPRINGFIELD · County 011, Idaho · Built 1974 · 2 Lanes · 100 vehicles/day
Overall
Deck
5
Fair
Superstructure
5
Fair
Substructure
5
Fair
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 5 | Fair |
| Superstructure | 5 | Fair |
| Substructure | 5 | Fair |
Location
43.083094, -112.771367
This bridge is in worse condition than 76% of bridges in County 011. The average bridge in Idaho is 0 years old; this one is 52 years old.
Nearby Bridges
SH 39 over LOW LINE CANAL
Built 1977
SH 39 over ABERDEEN SPRINGFIELD CNL
Built 1977
VAMBAUR ROAD over LOW LINE CANAL
Built 1966
BUTTE ROUND ROAD over DESERT DRAIN
Built 1979
STERLING NORTH RD over ABERDEEN SPRINGFIELD CNL
Built 1982
1000 SOUTH ROAD over LOW LINE CANAL
Built 1972
SH 39 over HIGHLINE CANAL
Built 1977
ANDERSON ROAD over LOW LINE CANAL
Built 1972
STC1838;STERLING W over LOW LINE CANAL
Built 1983
GRANDVIEW ROAD over HIGH LINE CANAL
Built 1971
Bridge Details
- Structure #
- 000000000022745
- Year Built
- 1974
- Length
- 23.8 m (78.1 ft)
- Max Span
- 11.3 m
- Width
- 9.2 m (30.2 ft)
- Lanes
- 2
- Daily Traffic
- 100
- Material
- Prestressed Concrete
- Design
- Tee Beam
- Owner
- County Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $390,000
- Total Project Cost
- $585,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.