1000 SOUTH ROAD over LOW LINE CANAL
1.5 W. 1.0 N STERLING · County 011, Idaho · Built 1972 · 2 Lanes · 150 vehicles/day
Overall
Deck
7
Good
Superstructure
6
Satisfactory
Substructure
6
Satisfactory
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 7 | Good |
| Superstructure | 6 | Satisfactory |
| Substructure | 6 | Satisfactory |
Location
43.052, -112.764539
This bridge is in worse condition than 17.1% of bridges in County 011. The average bridge in Idaho is 0 years old; this one is 54 years old.
Nearby Bridges
ANDERSON ROAD over LOW LINE CANAL
Built 1972
STC1838;STERLING W over LOW LINE CANAL
Built 1983
VAMBAUR ROAD over LOW LINE CANAL
Built 1966
SH 39 over ABERDEEN SPRINGFIELD CNL
Built 1977
SH 39 over LOW LINE CANAL
Built 1977
S 2400 W; ANDERSON over HIGH LINE CANAL
Built 1974
SH 39 over HIGHLINE CANAL
Built 1977
STERLING NORTH RD over ABERDEEN SPRINGFIELD CNL
Built 1982
GRANDVIEW ROAD over HIGH LINE CANAL
Built 1971
1300 SOUTH ROAD over LOW LINE CANAL
Built 1970
Bridge Details
- Structure #
- 000000000022575
- Year Built
- 1972
- Length
- 11.3 m (37.1 ft)
- Max Span
- 11 m
- Width
- 9.2 m (30.2 ft)
- Lanes
- 2
- Daily Traffic
- 150
- Material
- Prestressed Concrete
- Design
- Tee Beam
- Owner
- County Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $273,000
- Total Project Cost
- $410,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.